HDB put this parcel out to tender and names Eight Courtyards as what was built on it. Everything below is from that tender: the dates, the winning price, and the 2 bids that came in.

  1. Tender launched5 May 2010
  2. Tender closed18 Jun 20102 bids received
  3. Awarded23 Jun 2010Nam Hee Contractor Pte Ltd. and FCL Topaz Pte. Ltd.
  4. Winning tenderS$229,400,000S$3,457 per sq m of gross floor area · S$321 per sq ft
Parcel
Yishun S4c Yishun Ave 2 / Ave 7 / Canberra Drive
Site area
26,540 sq m
Lease
99 yrs
Plot ratio
2.5
Gross floor area
66,349 sq m
Sold as
Condominium
Every bid — all 2, as HDB published them
Ranked by amount. The gap column is each bid measured against the winning one — subtraction, not a judgement about whether anyone bid well.
#TendererBidBehind the winner
1Nam Hee Contractor Pte Ltd. and FCL Topaz Pte. Ltd.S$229,400,000
2Perfect Eagle Pte. Ltd.S$196,000,000S$33,400,000 · 14.6%

What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.

Source: HDB — Sites Sold by HDB · tender awarded 23 Jun 2010 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “Eight Courtyards”. This parcel, from tender to today · Every land sale

What has been filed there since

2010 · the groundS$229,400,000S$321 per sq ft of gross floor area
Today · the homes on it$1,257median of 116 filed transactions, 2021-09 to 2026-09

Those two are not the same square foot. Gross floor area includes what nobody buys — the corridors, the car park, the plant rooms — so the land rate is spread across more area than a unit is sold by. The ratio is arithmetic on two published figures and is not a return, a profit, or an appreciation.

Year by year, for a median-sized unit

90–100 sqm band. Counts in brackets; a year with fewer than 3 filed sales is kept and marked rather than dropped, because a reader can discount a thin year and cannot discount one that was silently removed.
YearMedian psfAgainst the year before
2021$985 (2)
2022$1,186 (4)+20.4%
2023$1,179 (3)-0.6%
2024$1,283 (2)+8.8%
2025$1,276 (4)-0.5%

The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.