Otto Place

The ground under it was tendered in 2024. Both ends of that are public; nobody puts them together.

The land under Otto Place

HDB put this parcel out to tender and names Otto Place as what was built on it. Everything below is from that tender: the dates, the winning price, and the 4 bids that came in.

  1. Tender launched30 Nov 2023
  2. Tender closed1 Feb 20244 bids received
  3. Awarded14 Feb 2024Hoi Hup Realty Pte Ltd and Sunway Developments Pte. Ltd.
  4. Winning tenderS$423,380,000S$7,546 per sq m of gross floor area · S$701 per sq ft
Parcel
Tengah E3 Plantation Close
Site area
20,038 sq m
Lease
99 yrs
Plot ratio
2.8
Gross floor area
56,107 sq m
Sold as
EC
Every bid — all 4, as HDB published them
Ranked by amount. The gap column is each bid measured against the winning one — subtraction, not a judgement about whether anyone bid well.
#TendererBidBehind the winner
1Hoi Hup Realty Pte Ltd and Sunway Developments Pte. Ltd.S$423,380,000
2Forsea Residence Pte. Ltd. and CNQC Realty (Pioneer) Pte. Ltd.S$416,888,888S$6,491,112 · 1.5%
3Intrepid Investments Pte. Ltd. and TID Residential Pte. Ltd.S$398,597,597S$24,782,403 · 5.9%
4CDL Polaris Properties Pte. Ltd.S$383,800,000S$39,580,000 · 9.3%

What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.

Source: HDB — Sites Sold by HDB · tender awarded 14 Feb 2024 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “Otto Place”. This parcel, from tender to today · Every land sale

What has been filed there since

2024 · the groundS$423,380,000S$701 per sq ft of gross floor area
Today · the homes on it$1,754median of 596 filed transactions, 2021-09 to 2026-09

Those two are not the same square foot. Gross floor area includes what nobody buys — the corridors, the car park, the plant rooms — so the land rate is spread across more area than a unit is sold by. The ratio is arithmetic on two published figures and is not a return, a profit, or an appreciation.

Year by year, for a median-sized unit

80–90 sqm band. Counts in brackets; a year with fewer than 3 filed sales is kept and marked rather than dropped, because a reader can discount a thin year and cannot discount one that was silently removed.
YearMedian psfAgainst the year before
2025$1,755 (338)
2026$1,757 (27)+0.1%

The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.

The rest of it