  1. Tender launched24 Nov 1995
  2. Tender closed25 Jan 19964 bids received
  3. Awarded29 Mar 1996Heeton Development Pte Ltd / Koh Brothers Development Pte Ltd
  4. Winning tenderS$102,900,000S$3,419 per sq m of gross floor area · S$318 per sq ft
Parcel
Sembawang P1 Canberra Road
Site area
8,600 sq m
Lease
99 yrs
Plot ratio
3.5
Gross floor area
30,100 sq m
Sold as
Mixed

What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.

Source: HDB — Sites Sold by HDB · tender awarded 29 Mar 1996 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “Sun Plaza”. This parcel, from tender to today · Every land sale

What has been filed there since

1996 · the groundS$102,900,000S$318 per sq ft of gross floor area
Today · the homes on it$907median of 8 filed transactions, 2021-09 to 2026-09

Those two are not the same square foot. Gross floor area includes what nobody buys — the corridors, the car park, the plant rooms — so the land rate is spread across more area than a unit is sold by. The ratio is arithmetic on two published figures and is not a return, a profit, or an appreciation.

Year by year, every size at this address

Every size that sold, which is why it moves when the mix of sizes moves and not only when prices do — no single size band here has enough years to stand on its own yet. Counts in brackets; a year with fewer than 3 filed sales is kept and marked rather than dropped, because a reader can discount a thin year and cannot discount one that was silently removed.
YearMedian psfAgainst the year before
2021$743 (1)
2022$828 (1)+11.4%
2023$700 (2)-15.5%
2025$1,078 (2)+54.0%
2026$985 (2)-8.6%

The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.