Parc Canberra

The ground under it was tendered in 2018. Both ends of that are public; nobody puts them together.

The land under Parc Canberra

HDB put this parcel out to tender and names Parc Canberra as what was built on it. Everything below is from that tender: the dates, the winning price, and the number of bids received.

  1. Tender launched28 Jun 2018
  2. Tender closed4 Sep 20189 bids received
  3. Awarded10 Sep 2018Hoi Hup Realty Pte Ltd and Sunway Developments Pte Ltd
  4. Winning tenderS$271,000,000S$6,009 per sq m of gross floor area · S$558 per sq ft
Parcel
Sembawang E3b Canberra Link
Site area
18,041 sq m
Lease
99 yrs
Plot ratio
2.5
Gross floor area
45,102 sq m
Sold as
EC

What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.

Source: HDB — Sites Sold by HDB · tender awarded 10 Sep 2018 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “Parc Canberra”. This parcel, from tender to today · Every land sale

What has been filed there since

2018 · the groundS$271,000,000S$558 per sq ft of gross floor area
Today · the homes on it$1,283median of 5 filed transactions, 2021-09 to 2026-09

Those two are not the same square foot. Gross floor area includes what nobody buys — the corridors, the car park, the plant rooms — so the land rate is spread across more area than a unit is sold by. The ratio is arithmetic on two published figures and is not a return, a profit, or an appreciation.

Year by year, for a median-sized unit

80–90 sqm band. Counts in brackets; a year with fewer than 3 filed sales is kept and marked rather than dropped, because a reader can discount a thin year and cannot discount one that was silently removed.
YearMedian psfAgainst the year before
2021$1,083 (1)
2023$1,283 (4)+18.5%

The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.

The rest of it