Riverparc Residence

The ground under it was tendered in 2010. Both ends of that are public; nobody puts them together.

The land under Riverparc Residence

HDB put this parcel out to tender and names Riverparc Residence as what was built on it. Everything below is from that tender: the dates, the winning price, and the 4 bids that came in.

  1. Tender launched5 Aug 2010
  2. Tender closed23 Sep 20104 bids received
  3. Awarded27 Sep 2010Qingdao Construction (Singapore) Pte Ltd
  4. Winning tenderS$136,170,000S$2,551 per sq m of gross floor area · S$237 per sq ft
Parcel
Punggol E2a Punggol Drive/ Punggol East
Site area
15,700 sq m
Lease
99 yrs
Plot ratio
3.4
Gross floor area
53,380 sq m
Sold as
EC
Every bid — all 4, as HDB published them
Ranked by amount. The gap column is each bid measured against the winning one — subtraction, not a judgement about whether anyone bid well.
#TendererBidBehind the winner
1Qingdao Construction (Singapore) Pte LtdS$136,170,000
2Hoi Hup Realty Pte Ltd, Sunway Developments Pte Ltd & SC Wong Holdings Pte LtdS$133,210,000S$2,960,000 · 2.2%
3ChoiceHomes Investments Pte Ltd / CEL Development Pte LtdS$119,880,000S$16,290,000 · 12.0%
4Frasers Centrepoint LimitedS$103,428,800S$32,741,200 · 24.0%

What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.

Source: HDB — Sites Sold by HDB · tender awarded 27 Sep 2010 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “RiverParc Residence”. This parcel, from tender to today · Every land sale

What has been filed there since

2010 · the groundS$136,170,000S$237 per sq ft of gross floor area
Today · the homes on it$1,345median of 137 filed transactions, 2021-09 to 2026-09

Those two are not the same square foot. Gross floor area includes what nobody buys — the corridors, the car park, the plant rooms — so the land rate is spread across more area than a unit is sold by. The ratio is arithmetic on two published figures and is not a return, a profit, or an appreciation.

Year by year, for a median-sized unit

100–110 sqm band. Counts in brackets; a year with fewer than 3 filed sales is kept and marked rather than dropped, because a reader can discount a thin year and cannot discount one that was silently removed.
YearMedian psfAgainst the year before
2021$957 (2)
2022$1,115 (11)+16.5%
2023$1,291 (7)+15.8%
2024$1,443 (15)+11.8%
2025$1,467 (8)+1.7%
2026$1,440 (4)-1.8%

The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.

The rest of it