Lakeside Grove

The ground under it was tendered in 1996. Both ends of that are public; nobody puts them together.

The land under Lakeside Grove

HDB put this parcel out to tender and names Lakeside Grove as what was built on it. Everything below is from that tender: the dates, the winning price, and the 5 bids that came in.

  1. Tender launched26 Jan 1996
  2. Tender closed28 Mar 19965 bids received
  3. Awarded13 May 1996The Dynasty Corporation (S) Pte Ltd/SEADC Investment Pte Ltd/Refine Technology Pte Ltd/GEMT Trading Pte Ltd
  4. Winning tenderS$43,000,000HDB publishes no gross floor area for this site, so a rate per square foot cannot be worked out from what is published
Parcel
Jurong West S3a Corporation Road
Site area
21,219 sq m
Lease
99 yrs
Plot ratio
Gross floor area
Not published
Sold as
Condominium
Every bid — all 5, as HDB published them
Ranked by amount. The gap column is each bid measured against the winning one — subtraction, not a judgement about whether anyone bid well.
#TendererBidBehind the winner
1The Dynasty Corporation (S) Pte Ltd / SEADC Investment Pte Ltd / Refine Technology Pte Ltd / GEMT Trading Pte LtdS$43,000,000
2Pan Malayan Holdings LtdS$36,200,000S$6,800,000 · 15.8%
3Jurong Point Resources Pte LtdS$35,300,888S$7,699,112 · 17.9%
4May Flower Properties Pte LtdS$32,001,000S$10,999,000 · 25.6%
5SSL Properties Pte LtdS$29,006,236S$13,993,764 · 32.5%

What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.

Source: HDB — Sites Sold by HDB · tender awarded 13 May 1996 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “Lakeside Grove”. This parcel, from tender to today · Every land sale

What has been filed there since

1996 · the groundS$43,000,000HDB publishes no gross floor area for this parcel, so no rate can be worked out
Today · the homes on it$1,408median of 34 filed transactions, 2021-09 to 2026-09

Year by year, for a median-sized unit

150–160 sqm band. Counts in brackets; a year with fewer than 3 filed sales is kept and marked rather than dropped, because a reader can discount a thin year and cannot discount one that was silently removed.
YearMedian psfAgainst the year before
2021$1,083 (2)
2022$1,296 (8)+19.7%
2023$1,315 (1)+1.5%
2024$1,533 (3)+16.6%
2025$1,536 (2)+0.2%
2026$1,594 (5)+3.8%

The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.