Heron Bay

The ground under it was tendered in 2012. Both ends of that are public; nobody puts them together.

The land under Heron Bay

HDB put this parcel out to tender and names Heron Bay as what was built on it. Everything below is from that tender: the dates, the winning price, and the 7 bids that came in.

  1. Tender launched19 Jan 2012
  2. Tender closed1 Mar 20127 bids received
  3. Awarded6 Mar 2012Ho Lee Group Pte Ltd & Evia Real Estate Management Pte Ltd
  4. Winning tenderS$141,480,000S$3,262 per sq m of gross floor area · S$303 per sq ft
Parcel
Hougang E5 Upper Serangoon View/ Upper Serangoon Road
Site area
12,392 sq m
Lease
99 yrs
Plot ratio
3.5
Gross floor area
43,373 sq m
Sold as
EC
Every bid — all 7, as HDB published them
Ranked by amount. The gap column is each bid measured against the winning one — subtraction, not a judgement about whether anyone bid well.
#TendererBidBehind the winner
1Ho Lee Group Pte Ltd & Evia Real Estate Management Pte LtdS$141,480,000
2EL Development Pte LtdS$132,100,000S$9,380,000 · 6.6%
3Peak Living Pte LtdS$119,050,000S$22,430,000 · 15.9%
4Mezzo Development Pte LtdS$108,000,000S$33,480,000 · 23.7%
5Qingjian Realty (South Pacific) Group Pte LtdS$107,370,000S$34,110,000 · 24.1%
6Elitist Development Pte LtdS$106,000,000S$35,480,000 · 25.1%
7Frasers Centrepoint LimitedS$93,390,000S$48,090,000 · 34.0%

What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.

Source: HDB — Sites Sold by HDB · tender awarded 6 Mar 2012 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “Heron Bay”. This parcel, from tender to today · Every land sale

What has been filed there since

2012 · the groundS$141,480,000S$303 per sq ft of gross floor area
Today · the homes on it$1,271median of 159 filed transactions, 2021-09 to 2026-09

Those two are not the same square foot. Gross floor area includes what nobody buys — the corridors, the car park, the plant rooms — so the land rate is spread across more area than a unit is sold by. The ratio is arithmetic on two published figures and is not a return, a profit, or an appreciation.

Year by year, every size at this address

Every size that sold, which is why it moves when the mix of sizes moves and not only when prices do — no single size band here has enough years to stand on its own yet. Counts in brackets; a year with fewer than 3 filed sales is kept and marked rather than dropped, because a reader can discount a thin year and cannot discount one that was silently removed.
YearMedian psfAgainst the year before
2021$951 (21)
2022$1,077 (31)+13.2%
2023$1,253 (22)+16.3%
2024$1,304 (42)+4.1%
2025$1,366 (32)+4.8%
2026$1,413 (11)+3.4%

The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.

The rest of it