Altura
The ground under it was tendered in 2022. Both ends of that are public; nobody puts them together.
The land under Altura
HDB put this parcel out to tender and names Altura as what was built on it. Everything below is from that tender: the dates, the winning price, and the number of bids received.
- Tender launched23 Dec 2021
- Tender closed8 Mar 20229 bids received
- Awarded22 Mar 2022CNQC-OS (2) Pte. Ltd. and SNC Realty Pte. Ltd.
- Winning tenderS$266,000,000S$7,122 per sq m of gross floor area · S$662 per sq ft
- Parcel
- Bukit Batok E11 Bukit Batok West Avenue 8
- Site area
- 12,449 sq m
- Lease
- 99 yrs
- Plot ratio
- 3
- Gross floor area
- 37,348 sq m
- Sold as
- EC
What the land cost and what a unit sells for are not two ends of one sum. Between them sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold units. None of those is published for a named project, so this site does not estimate a developer’s cost or margin and no figure here should be read as one.
Source: HDB — Sites Sold by HDB · tender awarded 22 Mar 2022 · transcribed from HDB’s published tables on 2026-08-31 · prices are nominal and are not adjusted for inflation. HDB names the development on this row as “Altura”. This parcel, from tender to today · Every land sale
What has been filed there since
Those two are not the same square foot. Gross floor area includes what nobody buys — the corridors, the car park, the plant rooms — so the land rate is spread across more area than a unit is sold by. The ratio is arithmetic on two published figures and is not a return, a profit, or an appreciation.
Year by year, every size at this address
| Year | Median psf | Against the year before |
|---|---|---|
| 2023 | $1,478 (308) | — |
| 2024 | $1,491 (37) | +0.9% |
| 2025 | $1,491 (11) | 0.0% |
| 2026 | $1,620 (4) | +8.7% |
The two ends of this page are not two ends of one sum. Between the tender and the first unit sold sit construction over a multi-year build, financing, the development charge, marketing and agent commissions, GST, and the cost of holding unsold stock. None of those is published for a named project, so nothing here estimates a developer’s cost or margin and no figure on this page should be read as one. Why that is refused.