Landed · Sunset Way
6 filed transactions · District 21 · OCR
S$8,335k median price
URA Data Service — PMI_Resi_Transaction · 2021-09 to 2026-09 · accessed 2026-09-10
Which of these are you
- What it costs on the day, at $8,335,000Loan, downpayment, the cash CPF cannot cover, and both stamp duties
- Run six checks before you commitThe asking price, nearby MOP supply, land coming, and what could be built next door
- Put it beside another blockTwo or three side by side, in a link you can send to whoever else is deciding
Median price by month6 months with a sale
The transactions behind those figures6 of 6
Nothing modelled — these are the filed sales.
What has sold nearby300m
From 7 filed sales — the 20 most recent at each project, which is all this index keeps.
| Project | Away | Filed | Floor | Size | PSF |
|---|---|---|---|---|---|
| Landed · Sunset View | 286m | 2026-02 | — | 431 sqm | $2,347 |
| Landed · Sunset Terrace | 291m | 2026-02 | — | 336 sqm | $2,594 |
| Landed · Sunset View | 286m | 2026-01 | — | 408 sqm | $2,571 |
| Landed · Sunset View | 286m | 2025-04 | — | 692 sqm | $1,755 |
| Landed · Sunset View | 286m | 2023-09 | — | 412 sqm | $2,125 |
| Landed · Sunset Walk | 174m | 2023-04 | — | 1,027 sqm | $1,256 |
| Landed · Sunset View | 286m | 2023-03 | — | 1,296 sqm | $1,295 |
All 7 at this radius are listed. The floor band is what URA and HDB publish; neither feed carries a unit number.
The afternoon sun, and what is approved in it247°–293°
Seen from here, the sun sets at 247° (WSW) in December and 293° (WNW) in June — a swing of 47° across the year. A window on one of those bearings takes the low sun for part of the year and none of it for the rest.
Today the sun drops below 15° at 06:04 pm and sets at 07:00 pm, arriving from 273° (W). Above that angle it is over the roof rather than through the window; near the equator the midday sun is almost overhead, which is why this is only ever about the last hour.
Nothing published says which way a unit points — not URA, not HDB. You are the one standing in it, or holding the plan. If the floor plan carries a north arrow, the plan reader will read it off and say so when it cannot.
4 permitted planning decisions sit on those bearings within 400m. What it means depends entirely on which:
| Approved | Away | Bearing | Height | What |
|---|---|---|---|---|
| 2024-02-28 | 169m | 275° W | 2 storeys | Proposed new erection of 2-storey envelope control detached dwelling house with attic, swimming pool on lot 01940p mk0… |
| 2026-02-27 | 169m | 275° W | 2 storeys | Proposed new erection of 2-storey envelope control detached dwelling house with attic, swimming pool |
| 2026-05-07 | 169m | 275° W | 2 storeys | Proposed amendment to approved new erection of 2-storey envelope control detached dwelling house with attic, swimming … |
| 2025-04-22 | 307m | 290° WNW | 2 storeys | Proposed reconstruction to an existing 2-storey envelope control detached dwelling house with an addition of attic on … |
Where the money actually goes
Drag the sale price. Everything moves.
Look up somewhere else
Any HDB block or private project in Singapore.